BARIUM CONSTRUCTION and Partner Ltd has established a strong reputation in constructing various radical highways, bridges and interchanges projects using advanced technologies in concrete formworks and highways paving
Execution of field survey works for subscribers in Ma’an Governorate (CSS).
Cost: 160K
Client: Aqaba Water Company
Status: In progress
Installation of water meters, valves, pressure-reducing valves (PRVs), and a monitoring system within the Millennium Challenge Project in Zarqa Governorate.
Cost: 465K
Client: Miyahuna
Status: In progress
Construction works for the installation of polyethylene (PE) pipelines of various diameters to connect the Al-Himma water wells to the King Abdullah Canal.
Cost: 147K
Client: Miyahuna
Status: In progress
Provision of customer water meter reading (billing) services for the elevated service areas within the jurisdiction of the Jerash and Ajloun Water Administration.
Cost: 137K
Client: Miyahuna
Status: In progress
Provision of customer water meter reading (billing) services for the elevated service areas within the jurisdiction of the Jerash and Ajloun Water Administration.
Cost: 637K
Client: Yarmouk Water Company
Status: In progress
Construction of pipe culverts in all areas of the Greater Amman Municipality – Section One.
Cost: 669K
Client: Greater Amman Municipality
Status: Done
Supply and installation of a 1,200 mm diameter sanitary sewer line in the Wadi Al-Qamar area, within Russeifa District.
Cost: 1M
Client: Miyahuna
Status: In progress
Upgrading the water distribution pipeline network in Tafileh Governorate.
Cost: 2M
Status: In progress
Installation of new residential water service connections across all service areas of Jordan Water Company – Miyahuna (all areas of Amman).
Cost: 300K
Client: Miyahuna
Status: In progress
Supply and Installation of a 1200 mm Diameter Sewer Pipeline in Wadi Al-Qamar Area within Russeifa District
Cost: 1.1M
Client: Miyahuna (Jordan Water Company)
Status: Done
Upgrading of Water Pipeline Systems in Tafilah Governorate
Cost: 2M
Client: Ministry of Water and Irrigation
Status: Done
Tender for the Construction of Pipe Culverts in All Areas of the Greater Amman Municipality – Section One
Cost: 592K
Client: Greater Amman Municipality
Status: Done
Project for the Replacement and Regularization of Meters under the Southern Governorates Management Contract / Aqaba Water Company – Ma’an Governorate
Cost: 973K
Client: Ministry of Water and Irrigation – Water Authority of Jordan
Status: Done
Project for the Replacement and Regularization of Meters within the Service Area of the Southern Governorates Water Administration / Aqaba Water Company
Cost: 1.3M
Client: Ministry of Water and Irrigation – Water Authority of Jordan
Status: Done
Restructuring of the Water Network in East Marj Al-Hamam and Upper Naour
Cost: 1.7M
Client: Miyahuna (Jordan Water Company)
Status: Done
Restructuring of the Water Network in West Marj Al-Hamam
Cost: 1.9M
Client: Miyahuna (Jordan Water Company)
Status: Done
Construction of Fiber Optic Cable Routes for Zain Company during 2023
Cost: 3.3M
Client: Zain Telecommunications Company
Status: Done
Restructuring of the Water Network in West Marj Al-Hamam
Cost: 3.3M
Client: Zain Telecommunications Company
Status: Done
Maintenance of Existing Roads and Construction of Water Networks, Stormwater Drainage Systems, and Firefighting Points within the Zarqa Free Zone
Cost: 822K
Client: Jordan Free and Development Zones Group (Developing Jordan)
Status: Done
Provision of Meter Reading Services for Subscribers (Billing) in North and West Amman Areas
Cost: 844K
Client: Miyahuna (Jordan Water Company)
Status: Done
Provision of Meter Reading Services for Subscribers (Billing) in Zarqa Governorate
Cost: 554K
Client: Miyahuna (Jordan Water Company)
Status: Done
Construction of Fiber Optic Cable Routes for Zain Company during 2022
Cost: 3.3M
Client: Zain Telecommunications Company
Status: Done
Restructuring and Rehabilitation of the Transmission Pipeline in Madaba
Cost: 730K
Client: Miyahuna (Jordan Water Company)
Status: Done
Tender for the Construction of a Fiber Optic Cable Route to Connect Arab Access Company Sites with Zain Company during 2020
Cost: 1.7M
Client: Arab Access Company for Fiber Optic Installation and Works
Status: Done
Construction of Fiber Optic Cable Routes for Zain Company during 2021
Cost: 4.5M
Client: Zain Telecommunications Company
Status: Done
Construction of Fiber Optic Cable Routes for Zain Company during 2020
Cost: 2.6M
Client: Zain Telecommunications Company
Status: Done
Execution of Civil and Electromechanical Works for the Construction of Orange’s Fiber Optic Network during 2021
Cost: 954K
Client: Nokia Solutions and Networks
Status: Done
Construction Works for Water Networks in Various Areas of Aqaba
Cost: 231K
Client: Aqaba Water Company
Status: Done
Construction of Chalet Buildings and Swimming Pool Works
Cost: 400K
Client: Issa Muneer Issa Bosheh
Status: Done
Construction of Chalet Buildings and Swimming Pool Works
Cost: 400K
Client: Majdi Nu’man Mohammad Al-Atawneh
Status: Done
Reinstatement of Excavation Works in Various Service Areas of Miyahuna (Jordan Water Company) – West Amman and Al-Fuheis District
Cost: 350K
Client: Miyahuna (Jordan Water Company)
Status: Done
Reinstatement of Excavation Works in Zarqa Governorate / Russeifa District
Cost: 60K
Client: Miyahuna (Jordan Water Company)
Status: Done
Supply and Installation of Water Pipelines of Various Diameters to Improve the Water Supply System and Replace Existing Old Pipelines in Madaba Governorate
Cost: 193K
Client: Miyahuna (Jordan Water Company)
Status: Done
Installation of Water Pipelines and Household Connections in Various Areas of the Jordan Water Company
Cost: 500K
Client: Miyahuna (Jordan Water Company)
Status: Done
Construction of Fiber Optic Cable Routes for Zain Company during 2019
Cost: 2.5M
Client: Zain Telecommunications Company
Status: Done
Construction of Fiber Optic Cable Routes for Zain Company during 2018
Cost: 1.3M
Client: Zain Telecommunications Company
Status: Done
Construction of Fiber Optic Cable Routes for Zain Company during 2017
Cost: 1.6M
Client: Zain Telecommunications Company
Status: Done
Supply and Installation of Polyethylene Water Pipelines of 125 mm and 63 mm Diameters for the Improvement of Al-Musharraf Network / Mafraq
Cost: 19K
Client: Yarmouk Water Company (YWC)
Status: Done
Project for the Construction of a Fiber Optic Cable Route
Cost: 344K
Client: Umniah Telecommunications Company
Status: Done
Project for the Construction of a Fiber Optic Cable Route
Cost: 10K
Client: Umniah Telecommunications Company
Status: Done
Project for Supplying Water to Various Areas within the Governorate
Cost: 139K
Client: Water Authority of Jordan
Status: Done
Fiber Optic Cable Project for Connecting VTEL Jordan Customers in Amman
Cost: 664K
Client: VTEL Holdings Limited – Jordan
Status: Done
Tender for the Installation of Household Connections in Miyahuna (Jordan Water Company) Service Areas – Amman (3)
Cost: 250K
Client: Miyahuna (Jordan Water Company)
Status: Done
Project for the Construction of a Fiber Optic Cable Route
Cost: 3K
Client: Umniah Telecommunications Company
Status: Done
Project for the Construction of a Fiber Optic Cable Route
Cost: 20K
Client: Umniah Telecommunications Company
Status: Done
Project for the Construction of a Fiber Optic Cable Route
Cost: 213K
Client: Umniah Telecommunications Company
Status: Done
Project for the Construction of a Fiber Optic Cable Route
Cost: 11K
Client: Umniah Telecommunications Company
Status: Done
Project for the Construction of a Fiber Optic Cable Route
Cost: 32K
Client: Umniah Telecommunications Company
Status: Done
Project for the Supply and Installation of a Water Pipeline from Murabbaat Al-Nadeem to Ma’in
Cost: 157K
Client: Water Authority of Jordan
Status: Done
Tender for the Installation of Household Connections in Miyahuna (Jordan Water Company) Service Areas – Amman (4)
Cost: 250K
Client: Miyahuna (Jordan Water Company)
Status: Done
Project for the Construction of a Fiber Optic Cable Route
Cost: 86K
Client: Umniah Telecommunications Company
Status: Done
Project for the Construction of a Fiber Optic Cable Route along Shaqib Road
Cost: 104.5K
Client: Umniah Telecommunications Company
Status: Done
Project for the Construction of a Fiber Optic Cable Route
Cost: 188K
Client: Umniah Telecommunications Company
Status: Done
Project for the Maintenance of Fiber Optic Cable Routes
Cost: 34K
Client: Umniah Telecommunications Company
Status: Done
Installation of Household Connections in Miyahuna (Jordan Water Company) Service Areas – Amman (6)
Cost: 312K
Client: Miyahuna (Jordan Water Company)
Status: Done
Project for the Construction of a 16 km Fiber Optic Cable Route along Madaba Road
Cost: 302K
Client: Umniah Telecommunications Company
Status: Done
Fiber Optic Network Project
Cost: 771K
Client: Umniah Telecommunications Company
Status: Done
Execution of Asphalt Paving Works for Car Parking Areas in Front of Umniah Company Building
Cost: 50K
Client: Umniah Telecommunications Company
Status: Done
Project for the Construction of a Fiber Optic Cable Route for Expansion 11
Cost: 565K
Client: Umniah Telecommunications Company
Status: Done
Fiber Optic Cable Project for Connecting VTEL Jordan Customers in Amman during 2015
Cost: 259K
Client: VTEL Holdings Limited – Jordan
Status: Done
Project for the Construction of a Fiber Optic Cable Route
Cost: 697K
Client: Umniah Telecommunications Company
Status: Done
Rehabilitation of the Water Network in Ramtha and Bani Obaid
Cost: 373K
Client: Water Authority of Jordan
Status: Done
Rehabilitation of the Water Network in Mafraq and the Badia
Cost: 228K
Client: Water Authority of Jordan
Status: Done
Project for the Supply and Installation of a 4-inch Diameter Ductile Water Pipeline to Provide Water to Al-Areenba – Umm Hussein Area, Northern Badia
Cost: 138K
Client: Ministry of Water and Irrigation
Status: Done
Construction of a Transmission Pipeline from Al-Juhair Reservoir to Al-Mansoura / Al-Shoubak / Ma’an
Cost: 258K
Client: Ministry of Water and Irrigation
Status: Done
Installation of Household Connections in Miyahuna (Jordan Water Company) Service Areas – Amman (1 and 2)
Cost: 150K
Client: Miyahuna (Jordan Water Company)
Status: Done
Installation of Household Connections across All Service Areas of Miyahuna (Jordan Water Company) in Amman
Cost: 100K
Client: Miyahuna (Jordan Water Company)
Status: Done
Installation of Household Connections in Various Areas of Miyahuna (Jordan Water Company) – Amman Region (4)
Cost: 150K
Client: Miyahuna (Jordan Water Company)
Status: Done
Installation of Water Pipelines of Various Diameters and Types in Al-Salahiyah Village
Cost: 72K
Client: Miyahuna (Jordan Water Company)
Status: Done
Installation of Household Connections in Various Areas of Miyahuna (Jordan Water Company) – Amman Region (4)
Cost: 150K
Client: Miyahuna (Jordan Water Company)
Fiber Optic Cable Project for Connecting VTEL Jordan Customers in Amman during 2014
Cost: 232K
Client: VTEL Holdings Limited – Jordan
Status: Done
Construction of Fiber Optic Cable Routes during 2014
Cost: 11K
Client: Zain Telecommunications Company
Status: Done
Installation of Household Connections in South Amman Areas: Marj Al-Hamam, Jawa, New Hesban, Umm Al-Basateen, and Al-Juwaideh
Cost: 100K
Client: Miyahuna (Jordan Water Company)
Status: Done
Fiber Optic Cable Project for Connecting VTEL Jordan Customers in Amman during 2013
Cost: 39K
Client: VTEL Holdings Limited – Jordan
Status: Done
Construction of Foundations for Advertising Billboards, Bus Stops, and Public Seating
Cost: 50K
Client: Al-Nawaris Signage Company
Status: Done
Connection of Queen Rania Hospital and Ma’an Government Hospital to the Fiber Optic Network
Cost: 28K
Client: Royal Jordanian Air Force Command
Status: Done
Installation of a 4-inch Ductile Water Pipeline in Al-Joufeh Area – Al-Ajajreh Neighborhood, and Supply and Installation of a Water Pipeline for Shouneh Well No. 5
Cost: 87K
Client: Water Authority of Jordan – Balqa Water Directorate
Status: Done
Supply and Installation of a 150 mm Diameter Water Pipeline for the Urban Development Housing Project in Shafa Badran
Cost: 4K
Client: Miyahuna (Jordan Water Company)
Status: Done
Supply and Installation of a 100 mm Diameter Water Pipeline to Ahad Security Center
Cost: 94K
Client: Miyahuna (Jordan Water Company)
Status: Done
Construction of Sewer Network in Area Abu Alanda/ South Amman
Cost: 130K
Client: Ministry of Public Works
Status: Done
Supply and Installation of Ductile Pipelines and Household Service Connections under the Amman Water Restructuring Project
Cost: 76K
Client: Water Authority of Jordan
Status: Done
Construction of the Sewer Network in the Abu Alanda Area / South Amman
Cost: 125K
Client: Ministry of Public Works
Status: Done